Maersk FPSO conversion of a 308,000 DWT for Peregrino Field Brazil

OMT has assisted with all structural interfacing, outfitting to FPSO, arrangements and marine pipe systems. The main challenge of this project has been offshore standards and fatigue life of 30 years along with Maersk FPSO’s high documentation standard. 

Besides main structural design tasks such as foundations for topside modules with weights of up to 2,100 tonnes, a 54 m flare tower, helideck capable of hosting a Sikorsky S-92 and large deck cranes, the accommodation is also being extended to 100 persons.